Concrete Sidewalks & Walkways

Front walks, side paths and city sidewalk replacement done to grade.

Walkways are small jobs that get judged up close. Every day you step on them, and every visitor sees the edges, the joint spacing and whether the path drains or holds a puddle by the front door.

We form walks with real curves instead of faceted segments, keep a consistent width, run the grade so water sheds to the lawn, and finish with a broom texture across the direction of travel for traction in the rain.

Front entry walks

From driveway or street to the porch, sized wide enough for two people side by side.

Side-yard & utility paths

Narrow runs down the side of the house that keep you out of the mud year-round.

City sidewalk replacement

Panel replacement and trip-hazard removal poured to municipal specification.

ADA-friendly access

Cross slopes and running grades kept within accessible limits, with detectable warnings where required.

Steps & landings on a run

Where a slope is too steep for a ramp, we break it into safe, even steps.

Garbage & gate pads

Small pads that stop the wheel ruts in the lawn.

Get a price on this

Free on-site measure, written itemized estimate, no pressure.

(360) 555-0142

Request an estimate

Hours: Mon–Fri 7:00 AM – 6:00 PM · Sat 8:00 AM – 2:00 PM

Width, slope and the details people notice later

A single-file path can be 36 inches. A front walk where two people should pass comfortably wants 48 to 60. We mark the layout in paint first, because a walk that looks generous on a plan often feels tight once the shrubs grow in.

Cross slope stays gentle — around 2% — enough to shed water without feeling tilted underfoot. Where a walk meets a driveway or a public sidewalk we tool a clean expansion joint so the two slabs move independently instead of spalling at the seam.

Replacing city sidewalk and trip hazards

In most Snohomish County jurisdictions the sidewalk fronting a property is the owner’s maintenance responsibility, and raised panels caused by tree roots are the most common citation homeowners receive. We cut out and replace full panels, address the root cause where we can, and pour to the city’s thickness and finish requirements.

If a permit or an inspection is required we tell you before we start and handle the coordination so you are not the one calling the public works counter.

Small job, same standards

A 60-foot walkway gets the same base prep as a driveway: strip the sod, compact crushed rock, set forms to grade, add mesh or fiber reinforcement, and cut joints at regular spacing. Skipping base prep on small work is why so many walks look like a jigsaw puzzle after five winters.

Most walkways are a one to two day job, and we clean up the site the same day the forms come off.

What sidewalks & walkways cost in Marysville

Real planning ranges for our market — not a national average.

Walkways price at $10 to $16 per square foot. Small runs often land at our minimum job charge instead — the crew, truck and short-load fee cost the same whether we pour 60 or 200 square feet.

WorkUnitTypical rangeWhat that includes
Walkway or front entry walkper sq ft$10 – $164″ slab, broom finish, tooled edges
City sidewalk panel replacementper panel$600 – $1,200to municipal spec
Trip-hazard grindingper location$150 – $400where a full panel is not needed
Root cutting & root barrierper location$200 – $600so the lift does not come back
Curved or radius formingadd-on per linear ft+$6 – $12true curves, not faceted segments
Minimum job charge$1,800 – $2,500applies to small stand-alone walks

Typical complete projects

Front walk 4 ft × 25 ft (100 sq ft)

broom finish

$1,800 – $2,500

Side-yard path 3 ft × 60 ft (180 sq ft)

broom finish

$2,200 – $3,400

Two city sidewalk panels

incl. demo

$1,600 – $2,800

Ranges are for planning, not a quote. Your price depends on access, base condition, demolition, thickness and finish — we confirm it in writing after a site visit.

From this kind of job

Photos from our own projects around Snohomish County.

Questions we get about sidewalks & walkways

48 inches is comfortable for two people; 36 works for a secondary path. We lay it out with paint on the ground before pouring so you can see it at full size.
We can get close on finish and joint pattern, but new concrete always cures lighter than aged concrete and takes months to blend. Where an exact match matters, replacing a full panel usually looks better than patching.
Sometimes — grinding or panel replacement can solve a single raised joint. If roots are still growing under it, we will say so rather than repeat the same repair in two years.
Yes. Where the work is in the right-of-way we pull the permit and schedule the inspection as part of the job.

Ready for a straight answer and a firm price?

Send a photo of the area and a rough size — we’ll come out, measure and give you a written estimate at no charge.